Saturday, April 17, 2010

Pokemon Leaf Green Light Bulb

giveway Momo! SPRING 2010 COLLECTION PINS

Waiting to be able to operate the camera, so you can post photos of small objects 'Spring 2010' ... attend a giveway! E 'organized by' braverrima 'Momo Momo's treasures ..... do some incredible things!! Check it out! : D

Link post: http://momobijoux.blogspot.com/2010/04/cho-preso-gusto.html

Saturday, March 27, 2010

Hp Ink Cartridges Can 56 Be Used In Place Of 54

PRESS INFORMATION SYSTEM FOR LANDFILL AND CO.LA.RI.: technical and economic aspects

Today we present the second part of the statement of the meeting information on landfill Inviolata held Wednesday, 10/03/2010 at the center of old Santa. As anticipated, today announced that summarizes the technical aspects of the imposition of compensa CO.LA.RI Snoriguzzi expressed by Mauro and Stephen Rogge.

For completeness, also report that Claudio Bucci, President of the Lazio Region Health Board, in a brief speech expressed the hope that "The new Air Plan for the Lazio Region" could actually be used to block the project CO.LA .
RI
technical and economic aspects

Here are the salient points explained by the Legambiente Guidonia:
• The installation of mechanical-biological "in landfill operating mouth "(so we read on page. 90 of the Environmental Impact Assessment pending) which means, whatever people may say, the maintenance of the landfill for another 28 years.
• Essentially such a system separates a dirty green part, made up of organic material is not usable, and materials for eco-bales, fuel or RDF.
• The project includes a plant on an area of \u200b\u200b30 hectares, which can process 190,000 tons of waste (on pg. 46 of the Technical Report will show 600 T / day), with the production of at least 46,000 tonnes of refuse derived fuel (CDR), as well as an approximate altitude of 4,000 tons of ferrous metals recovered and a "residue", then, no less than 140,000 tons, including stabilized organic fraction (SOF), currently destined for landfill and waste itself. So about 60% of the treated waste ends up in landfills.
• The system then retrieves only a bit 'of energy at very high cost, 5% of metals and employs only 30 people held in the year.
• Currently, it seems that even under two distinct and separate facilities, for a total of 690 t of waste treated per day.
• According to what is allowed now, the maximum height from 147 meters above sea level is flooded, while the maximum volume of 3,820,000 cubic meters (we are currently almost to saturation).
• The fifth is the reservoir filling the first four reservoirs. •
are 300,000 inhabitants (47 municipalities) that send the garbage at the landfill.

clear that the CDR is a fuel obtained from the dry component (paper, plastics, textile fibers, etc..) Municipal waste, after a proper treatment of separation and purification from other materials such as glass, metals and aggregates. The CDR has the following average composition: 44% paper, 23% plastics, 12% textile waste, wood waste 4.5%, 14% organic decay and 2.5% inert.

Economic aspects that a plant of this size would have on our pockets''''
• 38 million euro for the construction,
• 16 million € / year for management,
• For a total of about 600 € in 28 years.

To better understand why this plant is uneconomic, just think that to organize the collection in the province of Rome would be enough for 14 million euro per year and 3 years would be enough to get up to speed.

Friday, March 26, 2010

Woolite Delicates For He Washers

INFORMATION SYSTEM FOR LANDFILL AND CO.LA.RI.: LEGAL FRAMEWORK

an information meeting held on Wednesday, 10/03/2010 Inviolata landfill at the old center of Saint Lucia were present: • The Advocate
Sebastiano Cubeddu, President of the Civic Party, "The Lighthouse, The
• Prof. Umberto Magnet;
• Stephen Rogge, Present Circle Environmental League of Guidonia;
Snoriguzzi • Mauro, Legambiente Guidonia
• Manuel Zito, City Council Guidonia IDV;
• Claudio Bucci, President of the Lazio Region Health Board;

Here is a statement in two separate post: today summarizes the legal framework of Advocate Stephen Cubeddu (a situation rebuilt for important dates), a subsequent press release will be devoted to technical aspects of the imposition of compensa CO.LA.RI expressed by Mauro Snoriguzzi and Stephen Rogge. In light of these clear and precise, which confirm both Outdated Technology CO.LA.RI system is the incompatibility of this project with our environment, we really struggle to understand the logic behind it.

LEGAL:

1990: The Ministry for Culture and Environment, signed by the same minister, expressed negative opinion on the location of the landfill in the area because Inviolata object of archaeological interest.

1991: The Ministry for Culture and Environment writes a letter to the mayor and magistrate of Tivoli Guidonia expressing clear opposition to the landfill in the area Inviolata for the reasons mentioned above.

1994: The Commando Carabinieri Tutela Patrimonio Culturale recovers to Livigno (SO) is the marble group, the only one existing in the world, showing "Jupiter, Juno and Minerva," called "Capitoline Triad", II-III century BC, the proceeds of an illegal excavation in the archaeological perpetrated "inviolable" City of Guidonia Montecelio (RM) in August 1992.

1996: The regional law 22/96 establishes the Archeological park Inviolata Guidonia, which is the area of \u200b\u200bthe landfill, with a total ban on opening new reservoirs. This law states the incompatibility of the landfill and arrange for its early closure with reclamation of the territory concerned. In particular, Article 7 puts a ban on movement of the land and building.

1998: the Archaeological Survey of Lazio wrote ".... While it is feared that should invalidate the law establishing the nature Inviolata Archaeological Park." And in 1999 that "the long time use of the plant involves a landfill undoubtedly further damage to the archaeological park and the surrounding environment. "

2003: The Regional Resolution No 1 August 2003 767 posted on the Guidonia list of those "where the pollutants are higher than he values \u200b\u200bthe limits for which action plans should be developed for the control of PM10 and benzene.

2005: With the Finance Act 2005 is replaced with the original map of the park is cut off, with a clumsy operation, the landfill and the space needed for the plant. Oblivious to all this, the Deputy Commissioner for Environmental Emergency in the Region of Lazio, has approved the draft submitted by the Consortium Laziale Waste - CO.LA.RI. concerning the implementation of an integrated plant for the treatment of non-hazardous waste to be located in their places in the town of Inviolata Guidonia.

2005: In September 2005 the unit for air pollution control Guidonia located in and controlled by ARPA Lazio been adapted to the measurement of PM10. The results of the last quarter of 2005, 2006, 2007, 2008 are public: the annual limit of the exceedance was always exceeded.

In conclusion, Sebastiano Cubeddu explained that the disagreement CO.LA.RI the project is motivated by different reasons such as alleged and documented in the use of the TAR Lazio, currently pending: stands in stark contrast with the completion of the archaeological park, in contrast with the regional waste plan, as opposed to the Consolidated environment and contrary to art. 32 of the Constitution, which protects health as a fundamental right of the individual and collective interest.